Case Studies

Case Study No. : 2

1. Clients Name Mr. Singh
2. Site Location Harrow, Middlesex , ENGLAND .
3. Area (M 2 ) 680 M 2
4. Client's Profile

Residence

5. Scope of Work i) demolition & Design Built.

ii) Excavation & Landscaping.

iii) Structural,

iv) Electrical, Mechanical, Plumbing,

v) Interior – Kitchen & Bathroom Fittings.

vi) Bespoke Joinery.

6. Time Duration of the Project 48 Weeks
7. Challenges

The entire property required to be systematically demolished and alternate quick design and built concept need to be introduced.

                                   © Fourways Supplies Limited 2006 | Contact Us | Information | Home
All rights reserved